All figures shown are just for reference.
Final power installed subjected to the layout. Should total exceeds 10KW, TiF rate will be cut to HKD 4, and we need to compute the final return and investment individually for you.
System power output subjected to location, inclination angel, direction of the system installed. Figures shown is based on average 1200 KWH generated per KW system.
Normal investment cost for reference.
We CATERPILLAR will apply the correct GPS location, installation details and weather dataset to get the best closest performance figures.
System annual efficiency drop < 0.5%, 25 yrs total drop < 14%